China Resources Cement (Wuxuan) 4500TPD Clinker Cement Production Line
Release Time:12/22/2023
order:57
Return
1. Project Introduction
It is a complete 4500tpd clinker
cement production line with 9MW waste heat recovery system and dock loading
system on turn-key basis,the first production line of China Resources Cement in
recent ten years .
2. Project characteristics
1) application of the
second-generation of high efficient low-nitrogen preheating precalcining
system.
2) application of high-speed rotary
kiln.
3) super giant clinker storage: it
is the first time to adopt a giant clinker storage of 200,000 ton’s storage
content with a diameter of 75m with no column.
4) phptovoltaic panel is used in
transporting corridor to reduce power consumption.
5) general application of various
advanced equipment such as permanent magnet motor, magnetic coupling, magnetic
suspension fan, high-efficient fan,etc.