Successful Putting into Operation of Cement Grinding System of EPCC Turnkey Project in Saudi Undertaken by Sinoma-CDI
Release Time:11/21/2025
On the 17th of November 2025, the cement grinding system of EPCC 10000TPD clinker cement production line project in Saudi undertaken by Chengdu Design & Research Institute of Building Materials Industry Co., Ltd. (herein referred to as Sinoma-CDI) as the turnkey contractor was put into operation successfully and has been maintaining stable running thereafter, 60 days ahead of the contractual schedule.
With designed capacity of 265 tons per hour, this cement grinding system has adopted the combined grinding process composed of roller press and tube mill with all the major equipment being Sinoma-branded and made-in-China. This combined grinding process has state-of-the-art process flow, reliably performed equipment, low power consumption and high-quality final product.
The earlier completion and putting into operation of the cement grinding system definitely helps the client grasp the window time of the local cement market at its peak, considerably improves the client’s production efficiency and competitiveness, demonstrates Sinoma-CDI’s performance and execution capability for overseas projects, and promotes acceptance and acknowledgement by overseas clients of Sinoma’s high-end equipment made in China, making great contributions to going global of domestic equipment.

EPCC Project over the Clouds (under construction)